Country

Bitte wählen Sie die gewünschte Sprachversion

Back
Notice
Advise
Print

RENOPLAN SYSTEM 1

How can a very rapid drying screed be produced?

If a new flooring construction, including the screed, has to be produced, with conventional screeds, a drying time of several weeks would be required. In renovation and refurbishment work, the working time and down time often need to be as short as possible. With the use of the rapid screed cement UZIN NC 192, the waiting time can be reduced to just one day. As a ready to use dry mortar mix, UZIN NC 192 only needs mixing with water on site using the prescribed water quantity. This is an advantage especially with regard to the reduced requirements of transport, storage and mixing equipment on site. For small areas of new screed, no great preparation work is needed. Rapid screed cement UZIN NC 192 can be mixed and delivered right where it is to be used.

uzinneu_background
Thank you. Your message has been transmited.
Recommend this site:
Fields markes with * are obligatory.
Addressee*
E-mail addressee*
Sender*
E-mail sender*
Please enter the characters in the picture below.*
Thank you for ....